Songjiang, Songjiang, Dongjing Town. Every run terminated, tested and labelled, as-built drawings handed over — describe what you see and we send the nearest engineer. We arrive with tools and common spare parts, diagnose first and quote before we touch anything.
Paying is fine. Not knowing what you are paying for is not. This is how we have always worked.
Fibre between floors or buildings, spliced and loss-tested with a redundant path.
Book now
A cabinet nobody can read, turned into one where faults take minutes to find.
Book now
Cabling planned from the floor plan before any drilling, so outlets land where desks go.
Book now
Phone, PoE, access control and CCTV runs pulled in the same job.
Book nowPlanned from the floor plan so outlets land at desks, then tested before handover.
Every run tested. Most intermittent faults are a bad termination, not the switch.
Fibre backbone spliced and loss-tested, with a redundant path where it matters.
Capacity planned for the next two years, not just for the desks you have today.
Conduit and trunking used, with data kept clear of power runs.
Work done to standard and documented, with test results handed over.
Final cost follows the survey and the agreed scope
| Item | Guide price | Note |
|---|---|---|
| Site survey and design | Free | On-site survey, scope and drawing before quoting |
| Data point (Cat6) | Per point | Cabling, outlet, termination and testing |
| Fibre backbone | Per run | Splicing, panels and loss testing |
| Cabinet tidy-up | Quoted | Re-termination, labelling and documentation |
| Industrial runs | Per metre | Conduit or trunking, fitted to site conditions |
| Certified testing | Included | Every run tested, results handed over |
We walk the site, count the points and agree the scope in writing.
Every cable, device and labour hour is listed with brand and quantity.
Work runs to an agreed schedule, outside your business hours if needed.
Every point is tested and labelled. You get the as-built drawing.
Real call-outs in this area
Planned from the floor plan, then every run tested and labelled before handover.
All 60 points certified
Old runs re-terminated and data separated from power. Two faulty runs replaced.
Dropouts gone
Fibre backbone spliced between the buildings with a redundant path.
One network, one cabinet mapYes. Dongjing Town sits inside Songjiang, which our engineers cover daily. On-site diagnosis is free, the quote is itemised, and nothing starts until you approve it.
Yes. Fit-outs and cutovers are routinely scheduled outside your working hours.
Often the same day, and within about 30 minutes when an engineer is already nearby. We confirm a time window before you book, so you are not left waiting at home.
No. Fixed once the scope is agreed. Anything you add is quoted before we do it.
Tell us what is wrong and when suits you. We diagnose first, quote second, and only start once you say go.
Free site survey · itemised quote · every run tested
Prefer to type? Tap WeChat above to copy our ID, then message us in English — we usually reply within 30 minutes.
Communities and streets in the same area, all as easy to reach